Heavy water spill in Bruce A, Unit 1, at Bruce Nuclear site
Wednesday (Jan. 19), there was a spill of heavy water onto the floor of Unit 1, Bruce A, at the Bruce Nuclear site, operated by Bruce Power.
Crews were completing maintenance on a moderator tank and a valve did not fully close as expected, resulting in the spill which was contained and fully collected within the powerhouse as designed, states a press release from Bruce Power. The spill was stopped immediately and the unit was taken off-line.
“There have been no adverse impacts to our employees, the environment or the public and the heavy water did not reach the natural environment,” states the release.
“An investigation to determine the cause of the event is under way and once complete, steps will be taken to implement any lessons learned.”
Background
Heavy water from the reactor contains levels of tritium, and station staff follow procedures to prevent, mitigate and promptly address any spills to protect workers, the plant, public and environment.
Procedures are in place to safely collect heavy water under these circumstances, which includes reducing access to the affected area, additional testing and confirmation of radiological protections, while clean-up is safely completed.
Written ByNo bio for this author.
Related Stories
No related stories.