Kincardine Record
Banner Ad
Banner Ad

Bruce Power suppliers advance "Made-in-Ontario" economic recovery

Bruce Power communicationsBy: Bruce Power communications  January 21, 2022
Bruce Power suppliers advance "Made-in-Ontario" economic recovery
Wednesday, Bruce Power and its supply-chain partners celebrated several key contracts in Bruce Power’s Major Component Replacement (MCR) project, which are advancing the company’s strategy to contribute to economic revitalization in Ontario.

“Last July, Bruce Power announced a $3-billion ‘Made-in-Ontario’ plan to invest in Ontario jobs and economic prosperity through our Life-Extension Program, medical isotope development, and asset optimization strategy,” said Mike Rencheck, Bruce Power’s president and chief executive officer (CEO).

“By investing in an Ontario-based supply chain, Bruce Power is supporting economic growth locally and helping to bring home-grown technology to the forefront of worldwide nuclear innovation.”

Victor Fedeli, Ontario minister of economic development, job creation and trade, offered his congratulations to Bruce Power suppliers ATS Automation, Cameco, and SGRT for their roles in advancing the MCR project.

“Recently, our government laid out its Build Ontario plan to drive our economic recovery and prosperity for every region of our province,” said Fedeli. “Ontario’s nuclear industry, including Bruce Power and its supply chain, is a key partner in this effort, as evidenced by Bruce Power’s $3-billion economic recovery plan announced earlier this year. These contracts mean good jobs for highly-skilled workers and economic activity for communities across the province.”

Energy minister Todd Smith echoed his congratulations and support.

“Ontario is seizing every opportunity to be a world leader in nuclear technologies and solutions, thanks to Bruce Power, and its supply-chain partners, including SGRT, ATS, and Cameco,” said Smith. “This announcement ensures that people have access to the job and economic opportunities presented by nuclear power, while helping to bring home-grown technology to the forefront of worldwide nuclear innovation.”

Cameco Fuel Manufacturing (CFM) and Bruce Power are celebrating the completion of calandria tube manufacturing for the upcoming Unit 3 MCR, scheduled to begin in 2023. The calandria tube order is part of a $62-million contract that was announced in 2017 and will see CFM produce all of the calandria tubes and annulus spacers needed for the six Bruce Power units undergoing MCR between 2020 and 2033. CFM delivered the first full reactor set of 480 calandria tubes ahead of the Unit 6 MCR, which began in January, 2020.

“Bruce Power’s MCR project continues to make substantial contributions to Ontario’s economic recovery and we are proud to be part of this important work today and into the future,” said Tim Gitzel, Cameco’s President and CEO. “As we celebrate another important milestone, we recognize it’s the dedication and hard work of the many talented people involved that are making Ontario’s clean energy future a reality.”

Bruce Power and Cambridge-based ATS Automation have solidified a $30-million contract to automate the installation and inspection of calandria tubes for the Unit 3 MCR – an industry-first for a CANDU nuclear refurbishment.

“Our team partnered closely with Bruce Power to achieve a common purpose, working together as one team,” said Udo Panenka, president of ATS Industrial Automation. “This type of collaboration demonstrates how innovation and technology can advance refurbishment efforts, delivering the first fully-automated system for fuel channel installation in a CANDU nuclear reactor, while ensuring the health and safety of workers and the dependable operation of a critical energy source.”

ATS has played an important role in Bruce Power’s MCR project by designing, testing, and manufacturing all the automation systems used to support the safe removal of pressure tubes, calandria tubes, and other components.

Building on the successful work by the Steam Generator Replacement Team (SGRT) on Unit 6, the joint venture between Aecon and SGT (a partnership between Framatome and United Engineers and Constructors) was awarded a contract for the replacement of eight steam generators in each of Units 3 and 4.

“We are incredibly proud of the progress that was made to safely advance Bruce Power’s Unit 6 MCR project in 2021,” said Jean-Louis Servranckx, president and CEO, Aecon Group Inc., on behalf of SGRT.

“With SGRT also being awarded a contract extension for Units 3 and 4 this year, we look forward to working with Bruce Power to continue executing in 2022 – ensuring the long-term future of the Bruce Nuclear Generating Station, continued job creation, and the supply of clean, reliable, low-cost energy for Ontarians.”



The video highlights the announcement, with comments from Mike Rencheck, president and CEO of Bruce Power; as well as Ontario economic development Victor Fedeli, energy minister Todd Smith, and environment minister David Piccini; video courtesy of Bruce Power

Related Stories

No related stories.

Share

    Comments (0)

  1. No Comments.

Leave a Comment

By submitting this form, I consent that my name (and email, if provided) will be published on kincardinerecord.com as part of this story.


Banner Ad
Banner Ad